What This Section
Shows You
- This section shows
you all the "contruction" drawings.
- The previous
Section D2 shows you just the KEY drawings.
- The next Section
D4 shows you all the "operating" drawings, plus some other reference
drawings.
Building In Phases
The track
unit drawings (Sheets 33, 34, & 35) and tracking wiring drawings
(Sheets 36, 37, & 38) show 3 "phases" of construction,
single-track, double-track, and 4-track. This allows you to build the
system in progressive steps, starting with just 1 track, then progress
to 2 tracks, then progress to 4 tracks.
Other Comments
- The first drawing,
Sheet 31, lists these drawings by number.
- You use the #1651
Main Control (Sheet 09, part of Drawing Set Item 4) from the Two-Track
Block Drawings, as the Main Control Unit for the 4-track Zellner Yard.
May 2006 Note - When
To Use The Model 402 Template
Use the Model 402 template (added May 2006) described in Section
C1, if
you want to build a 4-track control unit from "scratch", rather than
expanding a 2-track unit.
The Model 402 Yard
uses most of the drawings from the earlier 1654 design (Sections D1
thru D4), but there are 3 new drawings created for the one-piece
control unit: Cover Sheet, template, and parts list.
|